Current Status

AirPollutionControl2large.jpg

  1. The Navy Parts Control Center was put on the NPL on May 31, 1994
  2. The 1st cleanup action began on May 24, 1995
  3. Cleanup Processes include site study, remedy design, remedy construction, and post-construction.
  4. The final Remedy was selected September 24, 2010
  5. During Post Construction Time there is a 5 year review to make sure everything is running smooth.